The Spring of 2023 the Zumbro Bottoms BCH MN installed an additional 14 new tie lines to the West Camp.
Install Cross-members on the horse high-ties. Additional horses can then be tied.
This will also eliminate the need to have the high-tie cable staked into the ground.
Walnut Grove - installed additional high-ties. Repaired existing high-ties.
Install Cross-members on the horse high-ties. Additional horses can then be tied.
This will also eliminate the need to have the high-tie cable staked into the ground.
Walnut Grove - installed additional high-ties. Repaired existing high-ties.